Some testers perform a risk analysis before testing. Result of the risk analysis is a table with one row per identified risk which also identifies the program the risk item is ascribed to. The risk analysis table could be imported from an external file (e.g. Excel) and there could be links between the risk items and the tests.
Anonymous